So These Production Lines Are Needed In The Equipment To Complete:
1.50 IPC+PLC Control Loose Tube Cable Production Line To Finish The PBT Tube And Filling The Jelly Inside It
2.90 IPC+PLC Control ASU Cable SZ/Sheathing Production Line To Do The Tube/FRP*2 Stranding And Sheathing Both At One Time.
1.FRP Pay Off*2: Put On FRP From 630-1000mm.
2.Loose Tube Pay Off: Put On The Loose Tube From 630-1000mm.
3.SZ Stranding Device: Stranding Control By 2 Sets Servo Motor, Adjustable Pitch, Linkage With The Individual Cabinet.
4.Double Heads Binding Device: Binding Control By 2 Sets Servo Motor, The Concentricity Reaches 100% After Test, Linkage With The Individual Cabinet.